Distribution Network Operator (DNO) Applications

DNO Application

Cost effective grid connection

Redcotec have extensive experience of successfully obtaining grid connection approval for larger wind and PV projects. Our in-house capability and substantial database of wind turbine and solar inverter electrical details means that we are able to obtain a grid connection offer for you quickly and cost effectively.

Getting grid connection permission can be a challenging and time consuming task. This is primarily due to the high level of technical details required to make a successful application and the multiple options available. At Redcotec we cut through this complexity to provide clear-cut advice on the best route forward in terms of equipment sizing, connection options and possible network upgrade costs.

We are able to help with an independent network assessment if you are unsure of the most suitable size of generator or obtain a grid connection offer from the DNO (Distribution Network Operator) if you project is more advanced. Redcotec are here to help get your project off the ground smoothly and provide whatever design support you may need going forward.

More information

Training courses

Member of the Association of Energy Engineers Member of the Chartered Institute of Building Services Engineers Member of the Institute of Chemical Engineers Member of the Association of Energy Engineers Member of the Energy Institute